Saturday, August 18, 2012

Deck Reno #5

The deck is going along really smoothly. The brickies came through during the week and have done their thing.

We now have a flight of stairs off the high side of the deck, which will connect onto the existing footpath. We also have one step down onto the footpath near the family room.
 

 L: steps off the deck.
R: piers to support the slab and crushed concrete fill.

Rob has brought the digger back again as he needs it to move the fill around and to also dig a trench for the pergola down pipe to connect to.

Today we are expecting the plumber to arrive. We've decided to just move the tap instead of putting a drain in. Too fiddly and not exactly visually pleasing. The tap will be moved to be next to the steps.

No comments:

Blog Widget by LinkWithin